top of page

Phase 1: Kitchen & Bathroom Overhaul

  • nancykalterdills
  • Oct 3, 2025
  • 1 min read

The homeowner, a talented and innovative baker, sought a Masterplan for a two-phase renovation of her 1923 residence in the Berkeley Hills. Phase 1 involved a complete overhaul of the kitchen, powder room, and breakfast nook, as well as the reconstruction of the full bathroom located above the kitchen. We extended the bathroom's exterior wall by approximately 5 feet, gaining around 54 square feet of space. Phase 2 required special zoning permits and will (hopefully) be completed in 2025/2026.



ree

Existing Kitchen Sink Wall with portable island



ree

Existing Kitchen from Breakfast Nook



ree

Existing Kitchen looking at Breakfast Nook


ree

Existing Kitchen Looking back towards Entry


NEW KITCHEN

ree
ree
ree
ree
ree
ree
ree
ree
ree

 
 
 

Comments


Featured Posts
Recent Posts
Archive
Search By Tags
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page